8、清除大板瓷磚四周溢漿和表面污漬,建議留縫鋪貼,用找平器調平瓷磚。1. Level the paving base surface with cement mortar 7 days in advance, and lay the tiles after the mortar is dry for 7 days;
2. Prepare relevant tools, clean the base surface stains and loose particles, and then use the base surface reinforcement agent to roll on the base surface for 1 to 2
After it is dry and solidified, the next process construction is carried out;
3. Spread the mixed tile glue or cement mortar evenly on the wall, use a sawtooth scraper to pull the groove, and pay attention to keep the sawtooth scraping.
The consistency of the plate angle ensures that the height of the pull groove is consistent;
4. Clean up the release agent, oil, dust and other debris on the back of the large plate;
5. Open the packaging barrel and stir with an electric mixer or a gray knife for 2 to 3 minutes. There are a few particles, which will not affect the use.
8 hours;
6. Use a special scraper to evenly apply the stirred back glue to the back of the tile. If there are unstirred particles, they need to be scattered.
scrape off;
7. The tile surface and the cement mortar should be bonded within 15 minutes, and it is strictly forbidden to wait for dry paving;
8. Remove the overflowing slurry and surface stains around the large tiles. It is recommended to leave seams to pave and use a leveler to level the tiles.